Power system studies

No detail overlooked. Studies that go beyond the software output.

Studies are only as good as the engineering behind them

Studies evaluating safety, reliability and performance need to rely on more than just software output – they depend on proper system modeling, sound judgement and a clear understanding of real-world conditions.

Eleculator provides short-circuit, protective device coordination, and arc-flash studies for new and existing electrical infrastructure. Our turnkey study services are offered primarily to electrical contractors, and we regularly support equipment suppliers, developers, facility teams and fellow engineering firms.

How we can help

Every study is built on a system model we verify, not a template. Our power system
studies typically include the following.

Short-circuit studies

Fault current calculations that establish available short-circuit current at every distribution point and confirm equipment is rated for the system it actually serves.

Protective device coordination studies

Time-current curve analysis and selective coordination evaluation that keeps faults isolated and prevents outages that should never have happened.

Arc-flash Hazard Analysis

Incident energy and arc-flash boundary calculations that quantify hazard levels and support safer operation and maintenance.

Protective device settings

Recommended breaker and relay settings delivered in a form the field can implement.

Recommended Corrective Action

Practical engineering recommendations to address deficiencies identified during the study.

Arc-flash labeling support

Equipment labels that turn study results into something the field can actually use.

See it in the field

Full SCAAF study for an $800 million renovation of an iconic sports venue

With design changes still in progress, Eleculator was called into study new electrical infrastructure tied into existing systems.

Discover how we approached to this fast-moving project.

FAQs

Learn more about power system studies

What is a SCCAF study?

SCCAF stands for short-circuit, coordination, and arc-flash – three related studies delivered as one package. The short-circuit study establishes available fault current and confirms equipment ratings. The coordination study sets protective devices to isolate faults without taking down more of the system than necessary. The arc-flash study quantifies incident energy so the system can be operated and maintained safely.

Studies are typically required for new services and major infrastructure upgrades, for NYC EPR filings, and any time equipment is added or replaced or the utility service changes. NFPA 70E also requires arc-flash information to be current, which generally means a review every five years or after significant system modifications.

Yes. Protective device settings are key in coordinating electrical systems. We develop recommended settings for adjustable trip units and protective relays and we deliver them in a form the field can implement. A coordination study that produces curves but no settings has not finished the job.

Helpful inputs are one-line diagrams, equipment shop drawings, and feeder schedules. You do not need to chase the utility for available fault current. We can submit that request on your behalf. Existing systems rarely come with clean documentation, and for projects that need field data collection we deliver turnkey study services through trusted electrical contractor partners. Where assumptions are required, they are documented in the report.