EV charging sits at the intersection of utility infrastructure, power distribution design, equipment coordination and local permitting requirements. Get one wrong, everything else is thrown off.
Eleculator provides electrical engineering and infrastructure design for EV charging projects. From initial feasibility and utility coordination through signed and-sealed documentation and construction-phase support, we approach every EV project with a focus on constructability, scalability and planning for long-term growth.
Preliminary site layouts and charging infrastructure planning, with load analysis for proposed Day 1 and future chargers, establishing what the site needs from the utility before anyone commits to a service size.
Utility coordination focused on protecting the client’s interests and achieving favorable project outcomes.
Design and integration of load management systems that maximize charger count on the available service and can reduce or defer a service upgrade entirely.
Assessment and design of electrical system upgrades as required to support EV chargers at existing facilities.
Signed and sealed construction documents, single-line diagrams, site electrical plans, and equipment schedules, permit ready for AHJ submission.
Construction administration, field coordination, RFI and submittal review, inspection support, and as-built documentation support.
DC fast charging infrastructure across NYC and Long Island
EV charging sites live or die on two things the chargers have nothing to do with: What the utility decides, and what the AHJ approves.
See how we coordinated approvals and buildouts for multiple sites, each with its own service conditions and its own approval path.
Learn more about our EV charging infrastructure services
Sooner than most people expect. The utility timeline, not construction, is usually what sets the energization date. We start feasibility and utility coordination up front, and we have secured service determinations that materially reduced customer-side responsibility because the conversation happened before the design was locked.
Yes, and we recommend it. Right-sizing the service and designing conduit and raceway systems with future circuits in mind costs very little on Day 1 and prevents starting over when the charger count grows. Where a service upgrade is the obstacle, a load management system can often support the future count on the service you already have.
We do not provide expediting services. We provide permit ready documents suitable for submission to the AHJ, and we support the approval process from there. When comments come back, we address them immediately. The goal is to keep the ball in the plan examiner’s court until approval.
All of them. Our work spans Level 2 chargers, self-contained Level 3 DC fast chargers, and systems with central power cabinets and DC dispensers.