The Challenge: EV charging sites live or die on two things the chargers have nothing to do with: what the utility decides, and what the AHJ approves. Owner-operators sought to build multiple Level 3 DC fast charging sites across New York City and Long Island, each with its own service conditions, each with its own approval path.
Our Solution: Eleculator was engaged by the owner-operators to provide electrical construction documents and project coordination across the portfolio. We attended coordination meetings with the utilities and secured favorable service determinations that minimized customer responsibility. Throughout, we coordinated with the installing contractor to align site conditions, proposed construction methods, and the design before the permit set went to the AHJ.
The Results: Sites permitted, approved, and built, with customer-side infrastructure costs held down by favorable utility determinations secured early in design.