Renovations to 23 Waverly Place

Electrical engineering for a large co-op in Greenich Village

The Challenge: This mixed-use residential and commercial building was equipped with electric baseboard heaters, which are inefficient and costly. The plan was to replace these units with a central VRF heat pump system to improve energy efficiency and lower costs for residents struggling with high electric bills in winter.

Our Solution: Supplementing the existing project team with our electrical engineering services, we started with an existing condition assessment, including load calculations and determining available capacity for the upgrades. We chose to collaborate with an electrical contractor to assess existing equipment and discover options many design firms might overlook without having ground-level expertise. After giving the Co-op board multiple design options, we moved onto the design phase of the project and quickly determined that a second electrical service room was required to accommodate the required upgrades.

The Results: We submitted a CCD-1 special permission request with the city and received a favorable response, allowing the chosen systems to be implemented with minimal impact to existing systems and commercial tenants. In addition, we provided the NYC EPR filing services and received first-round approvals.

Lowering costs for a mixed-use development